Service Manual_2020-V1.0
31
8)Loosen the screw of the compressor bottom plate,
remove the floor together with the compressor from the
box.
9)Use the wrench to remove the bolts by
steps❹❺❻❼, replace the compressor and reverse
process can complete installation.
10)Use Pipe cutter cut off the condenser tube❽, then
Shear off capillary ❾ by the capillary tube scissors.
11)Replace the compressor and welding the compressor
pipeline.-❿Welding the process pipeline.-⓫Welding the
low-pressure muffler.-⓬Welding the high-pressure
exhaust pipe.