Changing the program sequence
32
Adding laundry during ongoing
delay start period
You can open the door to add or
remove laundry.
– All program settings will be saved.
– You can still change the drying level,
if required.
Open the door.
Remove or add the laundry.
Close the door.
Touch the Start/Stop sensor button
so that the delay start period
continues.
Program duration
Altering the program sequence can
cause the program duration shown on
the time display to be adjusted.