29
SERVICE FUNCTIONS
11
11-1. CHANGE IN DEFROST SETTING
Changing defrost finish temperature
<JS> To change the defrost finish temperature, cut/solder the JS wire of the outdoor inverter P.C. board.
(Refer to 12-6-1.)
Jumper wire Defrost nish temperature (°C)
JS
Soldered (Initial setting) 5
None (Cut) 10
11-2. PRE-HEAT CONTROL SETTING
PRE-HEAT CONTROL
When moisture gets into the refrigerant cycle, it may interfere the start-up of the compressor at low outside temperature.
The pre-heat control prevents this interference. The pre-heat control turns ON when the discharge temperature thermis-
tor is 20°C or below. When the pre-heat control turns ON, the compressor is energized. (About 50 W)
Pre-heat control setting
<JK>
ON: To activate the pre-heat control, cut the JK wire of the inverter P.C. board.
OFF: To deactivate the pre-heat control, solder the JK wire of the inverter P.C. board.
(Refer to 12-6.1)
NOTE: When the inverter P.C. board is replaced, check the jumper wires, and cut/solder them if necessary.
MUZ-BT20VG MUZ-BT25VG MUZ-BT35VG MUZ-BT50VG