Start-up and
inspection
1.
The compressor heater (CH) must have been oper-
ational for at least 6 - 8 hours before the compressor
start can be initiated. This is done by switching on
the control voltage and disconnecting the commu-
nication cable.
2.
F2040 must be addressed if it is to have another
address than 1. See chapter Addressing via cascade
connection, on page 42.
3.
The communication cable on the terminal block
AA23-X4 must not be connected.
4.
Turn the isolator switch on.
5.
Ensure that the F2040 is connected to the power
source.
6.
After 6 8 hours, connect the communication cable
(W2) to the terminal block AA23-X4.
7.
Restart the indoor module. Follow the instructions
for "Start-up and inspection" in the installation
manual for the indoor module.
The heat pump starts 30 minutes after the outdoor unit
has been powered up and the communication cable
(W2) has been connected, if necessary.
If scheduled silent operationis required, it must be
scheduled in the inner section or control unit.
Caution
Silent mode should only be scheduled period-
ically because the maximum output is limited
to approx. the nominal values.
Caution
Do not start any electrical work until at least
two minutes after cutting the power.
F2040-6 , -8
LEK
AA23
AA23-X4
AA23-S3
F2040-12 , -16
Främre el
Bakre el
LEK LEK
AA23
AA23-X4
AA23-S3
NIBE F2040Chapter 6 | Commissioning and adjusting44

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nibe F2040 Series and is the answer not in the manual?

Nibe F2040 Series Specifications

General IconGeneral
BrandNibe
ModelF2040 Series
CategoryHeat Pump
LanguageEnglish

Related product manuals