Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
Heating medium (page 27)
System flushed
System vented
Particle filter
Shut-off and drain valve
Charge flow set
Electricity (page 30)
Fuses property
Safety breaker
Earth circuit-breaker
Heating cable type/effect
Fuse size, heating cable (F3)
Communication cable connected
F2040 addressed (only when cascade
connection)
Connections
Main voltage
Phase voltage
When installing F2040-6, check that the
software version of the indoor mod-
ule/control module is at least v8320.
Miscellaneous
Warranty
Benchmark checklist