EasyManuals Logo
Home>Opus>Binding Machine>Atlas 190

Opus Atlas 190 User Manual

Opus Atlas 190
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
4
• It is necessary to check and supervise if the equipment is being used and operated
correctly, before reporting any malfunctions or problems to the service department
or dealer.
• Equipment must not be located outside or operated in temperatures under 8˚C / 46.4˚F
and must be operated in accordance with the general Health & Safety rules failure
to do so could cancel the guarantee.
• Repairs must be carried out by authorized sta, during the guarantee period, failure
to do so could cancel the guarantee.
• Always leave the arm (1) in the open position.
H = Hard cover. p = Pages. T = Transparent cover. S = soft cover. O = no cover.
Example: H/p/H =(H) hard cover/ (p)pages / (H) hard cover
Channel size H/p/H H/p/T S/p/S O/p/O
1,5 - - 1 - 15 1 - 15
3 - - 15 - 30 15 - 30
5 18 - 31 18 - 33 18 - 34 18 - 38
7 32 - 60 34 - 63 35 - 63 39 - 67
10 61 - 89 64 - 92 64 - 92 68 - 97
13 90 - 118 93 - 121 93 - 121 98 - 126
16 119 - 148 122 - 150 122 -150 127 - 155
20 149-186 151 - 189 151 - 189 156 - 194
 BINDING WITH METALBIND
1. Use the channel width selecting tool (7) or the table
below to choose the size of channel required.
5 PREPARATION TO WORK
After taking the device out of the packing box, start assembling the equipment, attach the
extended back support (12) on to the lower back support, by the pre drilled holes with the
screws and Allen key supplied, now fit the bind & de-binding handle (1) with the bolt and
Allen key supplied, in the hole in the side and tightened firmly.
Now place the COVER guide (8) in the binding slot with the ruler facing you. (see diagram on
the opposite page). The Cover guide is in the Storage slots together with De-binding tool.
The COVER guide has been specially designed to help you insert and center the covers and
documents into the channels easily, especially when using shorter channels.
It is very important that the plastic COVER guide bar is fitted correctly in the binding slot (3)
the sloped edges of the bar should be facing the binding jaw, please check by looking at
the diagram on the opposite page. The equipment is now ready for work.
4 SYMBOLS
Uwaga! Ryzyko przygniecenia i/lub skaleczenia.
Warning! Crushing or cutting risk.
ZASTOSOWANE SYMBOLE
BEZPIECZEŃSTWO
HEALTH & SAFETY
SYMBOLS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Opus Atlas 190 and is the answer not in the manual?

Opus Atlas 190 Specifications

General IconGeneral
BrandOpus
ModelAtlas 190
CategoryBinding Machine
LanguageEnglish