EasyManuals Logo
Home>Pioneer>Air Conditioner>YN009GMFI22RPD

Pioneer YN009GMFI22RPD User Manual

Pioneer YN009GMFI22RPD
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #63 background imageLoading...
Page #63 background image
60
12.2.3.2 Install the main body
Fix the hook with tapping screw onto the
wall
Hang the indoor unit on the hook.
(The bottom of body can touch with floor or
suspended, but the body must install vertically.)
14.2.1 Ceiling-floor unit installation
14.2.1.1 Service space for indoor unit
12.2.1.2 Bolt pitch
Ceiling installation
Capacity
(Btu/h)
D E
24K 983 220
36K 1200 220
48K 1565 220
Wall-mounted installation
3.4.1Install the pendant bolt
Ceiling installation
Select the position of installation hooks according
to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the
selected positions on the ceiling. Then embed the
expansible hooks (fittings).
Wall-mounted installation
Install the tapping screws onto the wall.(Refer to
picture below)

Table of Contents

Other manuals for Pioneer YN009GMFI22RPD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pioneer YN009GMFI22RPD and is the answer not in the manual?

Pioneer YN009GMFI22RPD Specifications

General IconGeneral
BrandPioneer
ModelYN009GMFI22RPD
CategoryAir Conditioner
LanguageEnglish

Related product manuals