Page 22
Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663
2) Cable connection: Communication cable connection:
The one with empty Link Port 0 is the
Master Battery Module, Which is connected
to the Inverter, other batteries are slave
batteries.
1 Master Battery configure with maximum
15 Slave Batteries in one string.
Figure 12: Battery communication cable connection diagram
Installation