8. Attach the gasket onto the trap
assembly so that the gasket
holes on the gasket line up with
the holes on the trap assembly.
9. Insert the trap assembly with
gasket up through the existing
hole in the jacket and secure
from inside the jacket. Use two
screws provided. Screw down
into the two “ears” molded into
either side of the trap. Snug the
trap assembly against the
furnace jacket compressing the
gasket slightly to eliminate any
air leaks. Do not
overtighten!
10. Attach the black molded rubber
90° elbow to the straight spout
on the trap top using a black
nylon clamp . Attach the other
end of the rubber elbow to the
spout located on the exhaust
transition using a black nylon
clamp.
11. Attach the end of the ribbed tube
to the 45° elbow molded into
the top of the trap assembly
using a black nylon clamp.
IMPORTANT: Tighten all clamp
connections with a pair of pliers
and check for leaks after
conversion is complete.
12. Connect a 5 1/2 ( riser to the top
of the tee and run a drain tube
from the bottom of the tee to a
floor drain or condensate pump.
Use a solvent cement that is
compatible with PVC material.
CONDENSATE DRAIN
FOR HORIZONTAL
INSTALLATION
Refer to Figure 33 for Steps 1-5.
1. This unit is shipped factory ready
for downflow
installation. The
condensate trap assembly and
drain hoses require conversion
for horizontal installation.
Remove the existing condensate
trap with the unit in the upright
position.
2. Remove the burner compartment
door from the unit.
3. Remove the two screws from the
right side of the furnace jacket
which support the trap mounting
bracket . Remove the two
plastic plugs on either side of the
trap outlet hole and discard.
4. Remove the (L-shaped) clear
vinyl drain tube from the top of
the existing trap .
Do not
disconnect the short end
from the furnace collector box.
5. Remove the ribbed drain tube
from the existing trap and the
exhaust transition . Discard this
tube. Retain the clamps for future
use. Additional clamps are
provided in the parts bag if any
clamps are damaged during
conversion process.
NOTE: The following steps should
take place with the furnace in the
horizontal position.
Refer to Figure 34 for Steps 6-11.
6. Locate the parts bag in the
burner compartment. Install two
plastic plugs in the side of the
jacket from bottom side up.
7. Fill the trap assembly with 1/2
cup of water.
FIGURE 32
DOWNFLOW CONDENSATE DRAIN
NEUTRALIZER CARTRIDGE
(OPTIONAL)
TO FLOOR DRAIN OR CONDENSATE PUMP
NOTE:
DRAIN VENT NEEDS
TO BE ABOVE
COLLECTOR BOX
DRAIN SPOUT.
MINIMUM HEIGHT
OPEN TOP
CONDENSATE TRAP
DRAIN LINE
I408
OVERFLOW LINE
(REQUIRED ONLY WHEN
OPTIONAL NEUTRALIZER
CARTRIDGE IS USED.)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem RGRJ series and is the answer not in the manual?

Rheem RGRJ series Specifications

General IconGeneral
BrandRheem
ModelRGRJ series
CategoryFurnace
LanguageEnglish

Related product manuals