EasyManuals Logo
Home>Ruijie>Switch>RG-ES100 Series

Ruijie RG-ES100 Series User Manual

Ruijie RG-ES100 Series
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
Ruijie RG-ES100 Series Switches Hardware Installation and Reference Guide System Debugging
4 System Debugging
4.1 Startup Check
4.1.1 Checking before the Device is Powered on
The switch is fully grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
4.1.2 Checking after Program Startup (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check whether the status of the switch indicator is normal.
Check whether the service interface forwards data normally.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie RG-ES100 Series and is the answer not in the manual?

Ruijie RG-ES100 Series Specifications

General IconGeneral
BrandRuijie
ModelRG-ES100 Series
CategorySwitch
LanguageEnglish

Related product manuals