Hybrid Solar Inverter User Manual
33
34
4.10. System Application Diagram
CT wire
Corresponding port in the meter
IA (white)
13
IA (blue)
14
IB (white)
16
IB (blue)
17
IC (white)
19
IC (blue)
21
NOTES:
The sequence of the grid cable must be connected correctly; otherwise, an error “Master Grid Phase
Error” will be occurred. For details, refer to Chapter 7 “Troubleshooting”. If this error occurs, switch the
position of L2 and L3 cables.
If the length of the RJ45 cable between the inverter and the meter exceeds 20 meters, install a 120Ω
resistor in ports 24 and 25 on the meter.

Other manuals for SAJ H2-10K-T2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ H2-10K-T2 and is the answer not in the manual?

SAJ H2-10K-T2 Specifications

General IconGeneral
BrandSAJ
ModelH2-10K-T2
CategoryInverter
LanguageEnglish

Related product manuals