3.Fix the batte cable on the batte copper terminal by positive and
negative in order.
Note:Batte temperature can be detected by temperature sensor that
integrated in the batte module, and the temperature data can be
reviewed on eSAJ App.
4.8.2
RJ45 Pin Po Denition
Figure 4.13
9-Pin serial po
/BMS
EMS/METER
PORT1
PORT0
RS485-A+
R/CT.I+
R/CT.1-
S/CT.1+
S/CT.I-
T/CT.1+
T/CT.1-
RS485-B-

Other manuals for SAJ H2-5K-T2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ H2-5K-T2 and is the answer not in the manual?

SAJ H2-5K-T2 Specifications

General IconGeneral
BrandSAJ
ModelH2-5K-T2
CategoryInverter
LanguageEnglish

Related product manuals