EasyManuals Logo
Home>SAJ>Inverter>H2 Series

SAJ H2 Series User Manual

SAJ H2 Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
H2 Series
36
5.8 System Connection
The system connection in Australia and New Zealand is as below, the neutral cable of AC and backup side
must be connected together for the safety reason.
Note: DO NOT connect the PE terminal of BACKUP side.
The system connection for grid system without special requirements is as below.
NoteThe backup PE line and earthing bar must be grounded properly. Otherwise, backup function may be
inactive during blackout.

Other manuals for SAJ H2 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ H2 Series and is the answer not in the manual?

SAJ H2 Series Specifications

General IconGeneral
BrandSAJ
ModelH2 Series
CategoryInverter
LanguageEnglish

Related product manuals