www.scheppach.com
GB
|
25
10.1 Checking the oil level (Fig. 17)
the oil pump. The oil level must be within the middle
mark on the dipstick. The machine must stand on lev
the oil level.
10.2 Ventilation screw
machine,
Such continuous compression/decompression will
machine. Before moving
machine, make sure the bleed screw is tight
ened to avoid oil leaking from this point.
10.3 Splitting logs
this, proceed as follows:
1.
2. Your machine
3.
splitting action.
The log splitter will freeze upon absence of either
hand.
machine
After this time interval, the oil under pressure will be
overheated and the machine could be damaged. For
thus should be discarded to protect the log splitter.
10.4 Hoist limiting
It is reasonable to limit the hoist of the pressure plate
material.
The pressure plate will now be resting in the selected
position.
10.5 Wrongly placed log (g. 13)
work table. Make sure logs will not twist, rock or slip
logs on the upper part. This will break the blade or
damage the machine.
Do not attempt to split several pieces of logs at the
10.6 Jammed log (g. 14 + 15)
and cause accident.
1.
2.
stops at its starting position, insert a wedge wood
3. Start the log splitter to push the wedge wood un
4.
11. Electrical connection
for operation. The connection complies with the ap
plicable VDE and DIN provisions.
ulations.
Damaged electrical connection cable
The insulation on electrical connection cables is of
ten damaged.
• Passage points, where connection cables are
passed through windows or doors.
• Kinks where the connection cable has been im
• Places where the connection cables have been cut
due to being driven over.
• Insulation damage due to being ripped out of the
wall outlet.
• Cracks due to the insulation ageing.
Such damaged electrical connection cables must not
damage.
Check the electrical connection cables for damage
not hang on the power network during the inspection.