Installing Your Machine
Only qualified service personnel should install Slayer espresso machines. Incorrect
installation may result in injury and/or damage to the equipment. Please read the
"Important Safety Information" section on page 5 before beginning installation.
Install your Slayer espresso machine with the following ordered steps:
1. Prepare Site
2. Unpack Equipment
3. Connect Drain Hose
4A-C. Connect Water Line
5. Connect Pump
6. Connect Machine to Power
7. Fill Tanks
8. Turn On Heating Elements
Step 1: Prepare Site
Your installation site will need direct access to power, water, and drainage. Building
regulations vary by region, so confirm local requirements prior to connecting your
machine.
Using quality, treated water is essential to achieving the best possible results when
preparing coffee and may also extend the life of your machine. Read the Water
Treatment Advisory on pages 6-7 for information about avoiding and addressing
water-related issues.
Your Slayer espresso machine weighs approximately 160 kg (350 lb.) when filled
with water and needs to be installed on a structure that is capable of supporting its
weight.
Use the following diagram to locate and drill holes in the counter for the water and
drain lines. Note that electrical plugs vary in size and a larger hole may be required
to accommodate the main power cord.!
9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Slayer 2 Group and is the answer not in the manual?

Slayer 2 Group Specifications

General IconGeneral
BrandSlayer
Model2 Group
CategoryCoffee Maker
LanguageEnglish

Related product manuals