PROT: The protocol type to which the port is set:
For a SolarEdge device:
RS485 protocol ZigBee protocol
S: SolarEdge slave
M: SolarEdge master
P2P: ZigBee point-to-point
MPM: ZigBee multipoint master (for
the ZigBee gateway or for load
management by the inverter)
MPS: ZigBee multipoint slave (for a
ZigBee router card)
For electricity meters, refer to the
application note -
Connecting an Electricity Meter to SolarEdge Devices
at
http://www.solaredge.com/files/pdfs/solaredge-meter-
installation-guide.pdf.
SS: SunSpec - for a non-SolarEdge logger (monitoring and control)
Smart Energy Management Status
This screen is displayed only when Smart Energy Management is enabled. The screen
shows energy details of the site:
S i t e L i m i t : 7 . 0 k W
S i t e P r o d : 1 0 . 0 k W
S i t e E x p o r t : 4 . 0 k W
S e l f - c o n s u m e : 6 . 0 k W
Site Limit: The limit that was defined for the site
Site Prod: The power produced by the site
Site Export: The power that is fed into the grid
Self-consume: The PVpower consumed by the site
For more information, refer to the
Export Limitation Application Note
,
available on the SolarEdge website at
http://www.solaredge.com/files/pdfs/products/feed-in_limitation_application_
note.pdf.
Chapter 6: User Interface 63
Three Phase System Installation Guide MAN-01-00057-4.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE3000 and is the answer not in the manual?

SolarEdge SE3000 Specifications

General IconGeneral
BrandSolarEdge
ModelSE3000
CategoryInverter
LanguageEnglish

Related product manuals