LOCAL - The power is controlled locally (e.g. by a fixed limit), or this
inverter limits the PV power production to its relative portion of the
feed-in power limit, as a result of disconnected communication with the
smart energy manager. If this status appears, check the communication
to the smart energy manager or the communication to the meter.
PWR Limit: The inverter maximum output power set by one of the power
limiting options:
RRCR
Smart energy manager (Feed-in limitation)
P(f)
P(U)
Q(U)
Cos Phi: The ratio between active to reactive power
Power Prod: The power produced by the inverter
For more information, refer to the
Power Control Application Note
,
available on the SolarEdge website at
http://www.solaredge.com/files/pdfs/application_note_power_control_
configuration.pdf.
Chapter 6: User Interface 65
Three Phase System Installation Guide MAN-01-00057-4.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE3000 and is the answer not in the manual?

SolarEdge SE3000 Specifications

General IconGeneral
BrandSolarEdge
ModelSE3000
CategoryInverter
LanguageEnglish

Related product manuals