EasyManuals Logo
Home>Tektronix>Test Equipment>2205

Tektronix 2205 Operator's Manual

Tektronix 2205
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
Applications
EXAMPLE.
In
Figure
3-1,
the
measured
peak-to-peak
vertical
deflection
is
4.4
divisions
using
a
10X
attenuator
probe
with
the
VOLTS/DIV
switch
set
to
5V
(10X
PROBE).
Substituting
the
given
values:
Vp-p
=
4.4
div
X
5
V/div
=
22
V.
Instantaneous
Voltage
To
measure
the
instantaneous
voltage
level
at
a
given
point
on
a
waveform,
referred
to
ground,
use
the
following
procedure;
1.
Apply
the
signal
to
either
the
CHI
or
the
CH2
input
connec¬
tor
and
set
the
VERTICAL
MODE
selector
to
the
channel
used.
2.
Verify
that
the
VOLTS/DIV
variable
control
is
in
the
CAL
detent
and
set
input
coupling
to
GND.
3.
Vertically
position
the
trace
to
the
center
horizontal
graticule
line.
This
establishes
the
ground
reference
location,
NOTE
If
the
measurements
are
to
be
made
relative
to
a
voltage
level
other
than
ground,
set
the
input
cou¬
pling
switch
to
DC
and
apply
the
reference
voltage
to
the
input
connector.
Then
position
the
trace
to
the
horizontal
reference
line.
4.
Set
the
input
coupling
control
to
DC.
Points
on
the
waveform
above
the
ground
reference
location
are
positive;
points
below
are
negative.
NOTE
if
using
Channel
2,
ensure
that
the
center
VERTI¬
CAL
MODE
selector
(NORM,
CH
2
INVERT),
is
set
to
NORM.
5.
If
necessary,
repeat
Step
3
using
a
different
horizontal
ground
reference
line
that
allows
the
waveform
in
Step
4
to
be
displayed
on
screen.
2205
Operator’s
3-3

Other manuals for Tektronix 2205

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix 2205 and is the answer not in the manual?

Tektronix 2205 Specifications

General IconGeneral
BrandTektronix
Model2205
CategoryTest Equipment
LanguageEnglish

Related product manuals