EasyManuals Logo
Home>UNI-T>Test Equipment>UT527

UNI-T UT527 User Manual

UNI-T UT527
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
14
To start the cord test press
1. Earth Bond Test
The unit will carry out an Earth Bond test in the same manner as a Class 1
appliance. The Pass mark for this test is 0.2
2. Insulation Test
The unit will then carry out an insulation test as previously discussed in the
manual. The PASS Mark for this test is 2 M.
Please note: When testing Surge Protected Extension Leads this test may fail.
This is normal and a result of circuitry within the surge protection device.
3. Polarity Test
The polarity test is the final test to be carried out and will check that the cord
or extension is wired correctly. It will check for open circuit, short circuit or
Line / Neutral reversal.
If the Polarity is correct then the meter will display “ Polarity”
If the Polarity test detects a fault, the meter will display “× Polarity”

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the UNI-T UT527 and is the answer not in the manual?

UNI-T UT527 Specifications

General IconGeneral
BrandUNI-T
ModelUT527
CategoryTest Equipment
LanguageEnglish

Related product manuals