12
►Connecting the ST module to the machine
♦ LC hydraulic part
With a cappuccino LC the refrigerator is delivered with the pipe already tted in the refrigerator, it remains
simply to feed it through the plate prepared for the purpose and x it to the cappuccino outlet end.
►Installing the bins
To avoid damage during transport, machines are
delivered with the bins removed
INSTALLING THE BINS:
- The bins are xed from behind. Respect the
direction of tting.
- Position the closing trap on the bins; pay attention
to the direction of the opening of the trap.
- Access to the trap is by removing the side.
- Capacity: 1.7 kg (4,5 liters) for the large bin.
- Capacity: 1.2 kg (3 liters) for the small bin.
INSTALLING POWDER BIN:
- Remove the powder cover forwards (locked by
the lock).
- The hoppers are xed from the rear. Observe the
mounting direction (picture).
- Reposition the cover and lock.
CAUTION:
Air must be able to circulate freely around the machine. The ventilation openings located at the rear of the
machine and on the top must not be obstructed.
The machine must not operate without its legs.