- 9 -
PREPARATORY STEPS
The new series of actuadors VULCAN, has been devised to serve
gates up to 800 Kg with leaf up to 3 meters wide (look at the
table technical data). Before proceeding with the installation,
please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly
greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• The stop limit switch must be installed inside the foundation
box (see paragraph about Installation of the stop limit switches)
INSTALLATION LAYOUT
1 1
2
4
3
C
5
D
A
B
LENGTH OF THE CABLE < 10 metres from 10 to 20 metres from 20 to 30 metres
Power supply 230V 3G x 1,5 mm
2
3G x 1,5 mm
2
3G x 2,5 mm
2
Photocells (TX) 2 x 0,5 mm
2
2 x 0,5 mm
2
2 x 0,5 mm
2
Key switch 4 x 0,5 mm
2
4 x 0,5 mm
2
4 x 0,5 mm
2
Photocells (RX) 2 x 0,5 mm
2
2 x 0,5 mm
2
2 x 0,5 mm
2
Flashing light 2 x 1,5 mm
2
2 x 1,5 mm
2
2 x 1,5 mm
2
Antenna (integrated into the flashing light) RG174 RG174 RG174
A
B
C
D
1
2
3
4
5
Key switch
Pillar photocells
Pillar-mounted digital radio switch
Safety edges
Motor
Transmitter
Control unit
Photocells
Flashing light
COMPONENTS ADDITIONAL ACCESSORIES