Operation PS (3-Phase) Series
wc_tx000123gb.fm 12
4.2 Prior to Operation
When the pump is delivered, first perform the following checks:
• Inspection
While unpacking, inspect the product for damage during shipment, and
make sure all bolts and nuts are tightened properly.
• Specification check
Check the model number to make sure it is the product that was
ordered. Be certain it is the correct voltage and frequency.
Note:
If there is any problem with the product as shipped, contact your
nearest dealer or Wacker representative at once.
• Product specifications
Do not operate this product under any conditions other than those for
which it is specified. Failure to observe this precaution can lead to
electrical shock, current leakage, fire, water leakage or other
problems.
CAUTION