PART 3 – EXECUTION
3.01 INSTALLATION
A. General: rig and install in full accordance with manufacturer’s requirements, project
drawings, and contract documents.
B. Location: locate chiller as indicated on drawings, including cleaning and service main-
tenance clearance per manufacturer instructions. Adjust and level chiller on support
structure.
C. Components: installing contractor shall provide and install all auxiliary devices and ac-
cessories for fully operational chiller.
D. Electrical: co-ordinate electrical requirements and connections for all power feeds with
electrical contractor (Division 16).
E. Controls: co-ordinate all control requirements and connections with controls contractor.
F. Finish:installingcontractorshallpaintdamagedandabradedfactorynishwithtouch-
uppaintmatchingfactorynish.
Guide Specifications (Cont'd)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the York YLAA and is the answer not in the manual?

York YLAA Specifications

General IconGeneral
ModelYLAA
CondenserAir-Cooled
EfficiencyHigh Efficiency
Sound Pressure LevelVaries by model (typically 70-85 dB)
DimensionsVaries by model
WeightVaries by model
CategoryAir-Cooled Scroll Chiller
Voltage208-575V, 3-phase, 50/60 Hz

Related product manuals