EasyManuals Logo
Home>Zephyr>Ventilation Hood>ALL-M90BBX

Zephyr ALL-M90BBX User Manual

Zephyr ALL-M90BBX
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
- 20 -
INSTALLING THE REMOTE
BLOWER
NOTE: The following instructions are for
preparing the hood for use with external or
in-line blower models CBE-1000 or PBN-
1000A. For blower installation details refer
to manual included with the blower.
1. Remove the blower plate unscrewing the
(4) 3.9x9.5 mm screws (Fig.15).
2. Install the external blower plate and secure
using (4) 3.9x6 mm screws (Fig.16)
3. Install 8” round blower collar to top of
blower housing screwing the (4) 3.9x9.5
mm screws (Fig.17).
FIG. 15
FIG. 16
FIG. 17
MOUNTING
SCREWS
3.9x6 mm
MOUNTING
SCREWS
3.9x9.5 mm
MOUNTING
SCREWS
3.9x6mm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr ALL-M90BBX and is the answer not in the manual?

Zephyr ALL-M90BBX Specifications

General IconGeneral
BrandZephyr
ModelALL-M90BBX
CategoryVentilation Hood
LanguageEnglish

Related product manuals