EasyManuals Logo
Home>Zephyr>Ventilation Hood>Venezia

Zephyr Venezia User Manual

Zephyr Venezia
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
14
Venezia Use, Care, and Installation Guide
VENEZIA
WALL
CORE
Installation Instructions
Mounting the Hood
At least two installers are required due to the
weight and size of the hood.
CAUTION
1. Measure from range top to hood bottom and
mark line A. (24” minimum from range top).
2. Plum and mark center line.
3. Mark mounting height line B. (10-1/4” from line
A)
4. Mark mounting spread from C/L on line B. From
center line to left mount mark (3-9/16”). From
center line to right mount mark (4-3/4”)
Wood blocking may need to be added behind
the drywall if no studs are present. Wall anchors
may also be used but check local codes for
compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could
result in personal injury or damage to cooking
surface or counter.
WARNING
FIG. B
Duct Cover Bracket
A
B
C/L
10-1/4"
C/L
24" min
1
3-9/16"
4-3/4"
5. Fasten (2) M4 x 1-1/4” screws into studs on line B. Do not fasten screws all the way.
6. Hang hood onto screws and hand tighten. (FIG. B1) Use the last M4 x 1-1/4” screw to further
secure the hood to the wall from inside the hood.
7. Center and attach duct cover bracket to wall below ceiling or sot using (2) #6 x 1” screws.
8. Remove tape securing electronics mounting bracket to hood. Reposition electronics mounting
bracket to hood and secure by two pre-installed screws as shown in (FIG. A1).
9. Install electrical.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr Venezia and is the answer not in the manual?

Zephyr Venezia Specifications

General IconGeneral
BrandZephyr
ModelVenezia
CategoryVentilation Hood
LanguageEnglish

Related product manuals