EasyManuals Logo
Home>Zephyr>Ventilation Hood>Venezia

Zephyr Venezia User Manual

Zephyr Venezia
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
29
Venezia Use, Care, and Installation Guide
ZEPHYRONLINE.COM
ACT™ Conversion
Enabling ACT™
To enable ACT™:
1. Before hood installation, gain access to PC board by following the steps shown on FIG. H.
2. Change plastic jumper positioning as shown in FIG. I to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the
hood body below the wiring diagram or in another clearly visible location.
To verify if your installer enabled ACT™:
1. With hood o, hold the On/O button for three seconds. The Display will show if ACT™ is disabled
and set to the maximum CFM or if ACT™ is enabled and set to one of the restricted maximum CFM
levels of 590, 390 or 290.
2. There should also be a foil label located inside the hood body near the wiring diagram that
indicates the blower CFM.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr Venezia and is the answer not in the manual?

Zephyr Venezia Specifications

General IconGeneral
BrandZephyr
ModelVenezia
CategoryVentilation Hood
LanguageEnglish

Related product manuals