3.3 Hanging installation
Use the screws connenct the hanging bar , The maximum lifting capacity cannot exceed
20 panels,and the inner connection pieces is needed.
Installation steps:
a. Fixed the hanging bar on the structure .
b. Align the screw holes of the panel with hanging bar and fixed the panel.
c. Install other panels, and tighten the screws in four directions .
d. Install the inner connection picces .
e. Complete the connection between the network cable and the power cable .
f. Complete the modules installation .