5.
BENCHMARK
COMMISSIONING
CHECKLIST
I
MAINS
PRESSURE
HOT
WATER
STORAGE
SYSTEM
COMMISSIONING
CHECKLIST
This
Commissioning
Checklist
is
to
be
completed
in
full
by
the
competent
person
who
commissioned
the
boiler
as
a
means
of
demonstrating
compliance
with
the
appropriate
Building
Regulations
and
then
handed
to
the
customer
to
keep
for
future
reference.
^
Failure
to
install
and
commission
this
equipment
to
the
manufacturer's
instructions
may
invalidate
the
warranty
but
does
not
affect
statutory
rights.
Customer
Name
Telephone
Number
Boiler
Make
ar^d
Model
Boiler
Serial
Number
I I I
1
I
1
I I
1 1
I I
I
I I I
1
I I I
!
I I
1 1
I I
I
I
I I I I
I I
1
I
I I I
Commissioned
by
print
rtame)
CORGI
ID
Number
^
Company
Name
^
Telephone
Number
Company
Address
:
Commissioning
Date
To
be
completed
by
the
customer
on
receipt
of
a
Building
Regulations
Compliance
Certificate*:
Building
Regulations
Notification
Number
(if
applicable)
.
ALL
SYSTEMS
PRIMARY
SETTINGS
(indirect
heating
only)
is
the
primary
circuit
a
sealed
or
open
vented
system?
What
Is
the
maximum
primary
flow
temperature?
ALL
SYSTEMS
What
is
the
incoming
static
cold
water
pressure
at
the
inlet
to
the
system?
Has
a
strainer
been
cleaned
of
Installation
debris
(if
fitted)?
Yes
J
Is
the
installation
in
a
hard
water
area
(above
200ppm)?
Yes
If
yes,
has
a
water
scale
reducer
been
fitted?
Yes
What
type
of
scale
reducer
has
been
fitted?
Time
and
temperature
controls
have
been
fitted
in
compliance
with
Part
L
of
the
Building
Regulations?
Type
of
control
system
(if
applicable)
Is
the
cylinder
solar
(or
other
renewable)
compatible?
What
is
the
hot
water
temperature
at
the
nearest
outlet?
^
What
is
the
pressure
reducing
valve
setting?
Has
a
combined
temperature
and
pressure
relief
valve
and
expansion
valve
been
fi
tted
and
discharge
tested?
The
tundish
and
discharge
pipework
have
been
connected
and
terminated
to
Part
G
of
the
Building
Regulations
Are
all
energy
sources
fitted
with
a
cut
out
device?
^
Has
the
expansion
vessel
or
internal
air
space
been
checked?
THERMAL
STORES
ONLY
What
store
temperature
is
achievable?
What
is
the
maximum
hot
water
temperature?
ALL
INSTALLATIONS
>3
The
hot
water
system
complies
with
the
appropriate
Building
Regulations
The
system
has
been
installed
and
commissioned
in
accordance
with
the
manufacturer's
instructions
The
system
controls
have
t>een
demonstrated
to
and
understood
by
the
customer
The
manufacturer's
literature,
including
Benchmark
Checklist
and
Service
Record,
has
been
explained
and
left
with
the
customer
Commissioning
Engineer's
Signature
Customer's
Signature
(To
contirm
salisractory
demonstration
and
racaipt
o!
manufacturer^
literature)
*AI1
InstailaUons
In
Ensland
and
V^tes
must
be
notified
to
Local
Authority
Building
Control
(LABC)
^her
directly
or
through
a
Competent
Persons
Scheme.
A
BuiKfing
Bssulatlona
Compliance
Certincate
will
then
be
issued
to
the
customer.
.
benchmark
GHeating
and
Hotwater
Industry
Council
(HHIC)
vwvw.centridheatlng.co.uk

Other manuals for Ariston ST 100 ProTech

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ariston ST 100 ProTech and is the answer not in the manual?

Ariston ST 100 ProTech Specifications

General IconGeneral
BrandAriston
ModelST 100 ProTech
CategoryWater Heater
LanguageEnglish

Related product manuals