EasyManuals Logo
Home>Atag>Boiler>IC series

Atag IC series User Manual

Atag IC series
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
User manual ATAG iC, iS and iR-Range
13
6 Decommissioning the boiler
In case of, for instance, a holiday:
Make sure no heat request occurs: set the room thermostat to low.
Hot water (iC-Range only)
Hot water program OFF: Press – until the lowest value is
reached and then press – again. The display shows - - .
Switching on works in reverse order.
Central heating
CH program OFF: Press – until the lowest value is
reached and then press – again. The display shows - - .
Switching on works in reverse order.
In case of work on the heating installation:
Make sure no heat request occurs: set the room thermostat to low. Pull the plug
from the wall socket. If the installation is being drained, you have to take into
account that part of the heating water will remain in the boiler. Make sure that the
remaining heating water in the boiler cannot freeze in case of frost.
+
-
-
+
reset
eco
+
-
-
+
reset
eco

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag IC series and is the answer not in the manual?

Atag IC series Specifications

General IconGeneral
BrandAtag
ModelIC series
CategoryBoiler
LanguageEnglish

Related product manuals