EasyManuals Logo
Home>Baxi>Boiler>EcoBlue Advance 13 Heat ErP

Baxi EcoBlue Advance 13 Heat ErP User Manual

Baxi EcoBlue Advance 13 Heat ErP
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
12 7219722 - 01 (04/15)
3 Technical Specifications
3.1.1. Clearances
1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around
the boiler for case removal, spanner access and air movement
(Figs. 1 & 2). Additional clearances may be required for the
passage of pipes around local obstructions such as joists
running parallel to the front face of the boiler.
625mm
370mm
5mm Min
5mm Min
For Servicing
Purposes
In Operation
5mm Min
At least
1.5°
Fig. 1
120mm Min
Fig. 2
190 mm
35mm Min
in Cupboard
800mm Min
270mm
MainEco Heat

Other manuals for Baxi EcoBlue Advance 13 Heat ErP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baxi EcoBlue Advance 13 Heat ErP and is the answer not in the manual?

Baxi EcoBlue Advance 13 Heat ErP Specifications

General IconGeneral
BrandBaxi
ModelEcoBlue Advance 13 Heat ErP
CategoryBoiler
LanguageEnglish

Related product manuals