EasyManuals Logo
Home>Braun>Lifting Systems>L917IB

Braun L917IB User Manual

Braun L917IB
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
Page 12
Base Plate
Lift Installation Instructions
1
Lift Positioning (continued)
Figure G
1/2"
Minimum
Clearance
Base Plate
Wedges
1" Minimum Clearance
Rear Door and
Extensive
Floor-to-Ground
Installations
Rear Door and Extensive
Floor-to-Ground Installations:
Position the lift in the rear door
opening as outlined on page
11. Depending on the particu-
lar lift model installed and the
particular vehicle configuration,
the top of the lift may need to
be tilted inboard slightly to
provide the minimum 1/2"
clearance between the lift and
the door(s) and/or to increase
platform and vertical arm kick-
out (to provide adequate
clearance between lift and
vehicle). See Figure G.
There must be a minimum 1"
clearance between the lift
(vertical arms and/or automatic
inboard roll stop) and the
vehicle during lift operation.
Base Plate Mounting BoltsBase Plate
Mounting Bolts
Figure H
Base Plate Wedges:
Four base plate wedges are
supplied for shimming (tilting lift).
The plastic wedges provide full
depth base plate support. Use
one or two wedges per base
plate end as needed. Position
the wedges by aligning the
mounting holes in the wedges
with the base plate mounting
holes as shown in Figure H.
Check for obstruc-
tions such as gas
lines, wires, exhaust,
etc. before drilling or
cutting. Failure to do
so may result in
serious bodily injury
and/or property
damage.
W
A
RNING

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Braun L917IB and is the answer not in the manual?

Braun L917IB Specifications

General IconGeneral
BrandBraun
ModelL917IB
CategoryLifting Systems
LanguageEnglish

Related product manuals