EasyManuals Logo
Home>Danfoss>Heat Pump>DHP-L Opti

Danfoss DHP-L Opti User Manual

Danfoss DHP-L Opti
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
6.5 In the event of leakage
In the event of leakage in the hot water pipes between the heat pump
and water taps, close the shut-off valve on the cold water inlet immedi-
ately. Then contact your installer.
In the event of leakage in the brine circuit, turn off the heat pump and
call your installer immediately.
6.6 Cleaning the strainers for the heating and brine circuits
Note! The heat pump must be switched off at the main switch
before cleaning can be started.
Note! The strainers must be cleaned twice a year after
installation. The interval can be extended if there is evidence
that cleaning twice a year is not necessary.
Note! Have a cloth to hand when opening the strainer cover as
a small amount of water usually escapes.
1
2
4
3
1
1. Shut off tap
2. Cover
3. Strainer
4. O-ring
Clean the strainers as follows:
1. Switch off the heat pump.
2. For the brine circuit strainer - remove the insulation around the
filler cock.
3. Turn the shut-off cocks to the closed position (see figure above).
4. Unscrew the cover and remove it.
24 – User manual VUBMA902

Other manuals for Danfoss DHP-L Opti

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Danfoss DHP-L Opti and is the answer not in the manual?

Danfoss DHP-L Opti Specifications

General IconGeneral
BrandDanfoss
ModelDHP-L Opti
CategoryHeat Pump
LanguageEnglish

Related product manuals