Installation Guide Danfoss Link™ CC
16
12/2014 VISGL90N Danfoss Heating Solutions
4.1. Adding devices to the system
When adding devices to the Danfoss Link™ system, the distance between the
Danfoss Link™ CC and the device must not exceed 1.5m. To accomplish this
Danfoss Link™ Battery Supply Unit (BSU) is oered as an installation tool.
1. Slide o the lid and add batteries.
2. Slide the lid back on and attach the Danfoss Link™ BSU
battery pack onto the back of the Danfoss Link™ CC. When
ready to do the commissioning, turn the switch located on
the Danfoss Link™ BSU to the ON position.
Danfoss Link™ CC will now start up. This takes approximately
30 seconds.
01
+
-
x 10
1.5
AA
BSU
A battery pack (BSU) can be ordered on Danfoss code no. 014G0262.
4.2. Connecting power, setting country, language and date/time
?
1