4.9. Performing a network test
After nishing installation, perform a network test, to ensure that communica-
tion between all added devices and the Danfoss Link™ CC is stable.
Note! Do not perform the network test before the Danfoss Link™ CC is mounted in
its nal position and ensure that all living connects® are out of mounting mode, see
instructions following the living connect®.
1. Turn o the battery pack.
2. Slide the Danfoss Link™ CC onto the previously
installed mounting plate.
3. The Danfoss Link™ CC will now power-up.
4. Remove the front cover and press the SETUP pin
for 3 seconds to enter the service area.
If there is uncertainty about the network performance, it is recommended to
perform a network test before the installation is completed entirely.
?