EasyManuals Logo
Home>Danfoss>Controller>Link CC

Danfoss Link CC User Manual

Danfoss Link CC
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Installation Guide Danfoss Link CC
21
Danfoss Heating Solutions VISGL90N 12/2014
GB
4.9. Performing a network test
After nishing installation, perform a network test, to ensure that communica-
tion between all added devices and the Danfoss Link™ CC is stable.
Note! Do not perform the network test before the Danfoss Link™ CC is mounted in
its nal position and ensure that all living connects® are out of mounting mode, see
instructions following the living connect®.
1. Turn o the battery pack.
2. Slide the Danfoss Link™ CC onto the previously
installed mounting plate.
3. The Danfoss Link™ CC will now power-up.
4. Remove the front cover and press the SETUP pin
for 3 seconds to enter the service area.
If there is uncertainty about the network performance, it is recommended to
perform a network test before the installation is completed entirely.
?
1
Service Options
Status and Diagnostics
?
2
Status and Diagnostics
Network
?
3
Wireless Network Status
Start Network Test

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Danfoss Link CC and is the answer not in the manual?

Danfoss Link CC Specifications

General IconGeneral
BrandDanfoss
ModelLink CC
CategoryController
LanguageEnglish

Related product manuals