RT80Q Operator’s Manual Transport - 89
Tie Down
CMW
Plow
Lower plow to trailer deck and chain at
attachment frame and vibrator box. Make sure
chains are tight before transporting.
Reel Carrier
Lower reel carrier to lowest position and tie down
at attachment arms. Make sure chains are tight
before transporting.
NOTICE:
Engage attachment stow lock and
swing lock devices in addition to
securing at tiedowns.
Unsecured plow can swing outside
the trailer and become a traffic
hazard. Lower plow and chain to
trailer deck before hauling.
t33om019w.eps

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch RT80Q and is the answer not in the manual?

Ditch Witch RT80Q Specifications

General IconGeneral
BrandDitch Witch
ModelRT80Q
CategoryTractor
LanguageEnglish

Related product manuals