3.2 Metering pump - ‘EcoAdd’
1
2 3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Fig. 2: Layout of ‘EcoAdd’
1 Cable bushing for mains cable/power supply
2-5 Cable bushings to the main board with terminals
6 Level monitoring (suction lance connection)
7 Control unit
8 ON/OFF button
9 USB port
10 Touchscreen
11 Display cover
12 Position of type plate
13 Cable bushing for mains cable/power supply
14 Suction connection / suction valve
15 Pump head
16 Vent screw
17 Pressure connection / pressure valve
Structure
1410240750 Ver. 4-11.2023