EasyManuals Logo
Home>EINHELL NEW GENERATION>Inverter>STE 5000D

EINHELL NEW GENERATION STE 5000D User Manual

EINHELL NEW GENERATION STE 5000D
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
16
GB
before the onset of outdoor temperatures of bet-
ween -3°C and -10°C.
If the diesel fuel still freezes, you must move the
diesel generator to a place where the temperature
is approximately +10°C for a period of approxima-
tely 12 hours.
If the tank is between halfway and full with normal
diesel fuel, this should then be drain as described
in point 9.4.
Then fill the tank with winter diesel.
If the tank is between empty and half-full, simply
fill it up with winter diesel.
11. Ordering replacement parts
Please quote the following data when ordering repla-
cement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
Anleitung STE 5000D_SPK1:Anleitung STE 5000_D 18.01.2007 15:19 Uhr Seite 16

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EINHELL NEW GENERATION STE 5000D and is the answer not in the manual?

EINHELL NEW GENERATION STE 5000D Specifications

General IconGeneral
BrandEINHELL NEW GENERATION
ModelSTE 5000D
CategoryInverter
LanguageEnglish