EasyManuals Logo
Home>Emerson>Air Compressor>Copeland Scroll ZP KC Series

Emerson Copeland Scroll ZP KC Series User Manual

Emerson Copeland Scroll ZP KC Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
15
© 2016 Emerson Climate Technologies, Inc.
AE4-1303 R15
needs to be given to the oil line that connects the oil
sumps of the two compressors. For even tandems
(two compressors with equal capacities) there are two
options for connecting the compressor oil sumps--oil
equalization line (OEL) or two-phase tube line (TPTL).
For uneven tandems (two compressors with unequal
capacities)onlytheTPTLoptionisqualied.
After the compressors are mounted to the compressor
rails the entire assembly should be tilted back a minimum
of 12 degrees from horizontal (see Figure 10) to move
theoillevelawayfromtheSchraderttingsandsight-
glasses. If the compressor sumps are to be connected
with the TPTL the compressor sight-glasses can now
be removed for installation of the TPTL. The TPTL
Rotalockttingshouldbetorquedtothevaluelistedin
Table 6. If the compressor sumps are to be connected
with theOEL optionthe Schraderttings cannow be
removed by unscrewing them. Removing the Schrader
ttingsexposesthestubthatisusedtobrazetheOELto
each compressor. The oil equalization stubs of both
compressors should be wiped clean with a lint free
towel to remove any oil residue before brazing.
For a detailed instruction list of how to assemble a trio
of compressors, please contact Application Engineering.
SERVICE PROCEDURES
CAUTION
POE oil must be handled carefully and the proper
protective equipment (gloves, eye protection, etc.)
must be used when handling POE lubricant. POE
must not come into contact with any surface or
material that might be harmed by POE, including
without limitation, certain polymers (e.g. PVC/CPVC
and polycarbonate).
Field Replacement
WARNING
Use care and the appropriate material handling
equipment when lifting and moving compressors.
Personal safety equipment must be used.
Mounting
There is an older 7 to 15 ton scroll family (ZR*K3) as well
as a reciprocating compressor family (BR) that can be
replaced by this scroll compressor family. The mounting
dimensions of the older scroll and the reciprocating
compressor are 8.65" X 8.65" (220mm X 220mm) to the
center of the mounting holes. The newer scroll has a
mounting dimension of 7.5" X 7.5" (190mm X 190mm).
To help adapt to this new dimension use mounting
kit 922-0001-00 that contains an adaptor plate and
mounting bolts. It will bolt in place of the old compressor
mounts and has a 7.5" (190mm) square mounting bolt
hole pattern for the new compressor.
Removing Oil
IftheoillevelishigherthantheoilSchraderttingon
the sump of the compressor oil can be drained from
thistting untilthe oillevel reaches thelevel ofthe
Schradertting.Toremoveoilfrom thecompressor
when the oil level is below the oil Schrader tting
one of two different procedures can be used. The
rstprocedureistoremovethecompressorfromthe
system and drain the oil from the compressor suction
connection. This method ensures complete removal
of the oil from the compressor. The second procedure
is to remove the compressor sight-glass and insert a
hose into the sump of the compressor and draw the
oil out with a hand-held pump (Yellow Jacket Pump
UPC#77930).
Electrical
When replacing a compressor, especially one that has
beenintheeldforanumberofyears,itisalwaysa
good idea to replace the contactor.
Note: See the locked rotor on the nameplate of
the new compressor and make sure the contactor
exceeds this locked rotor rating.
Module
If the compressor to be replaced has a motor protection
module (i.e. ZR*K3) but the new compressor does not,
thefollowingmodicationsmustbemade.
1. Entirely remove the wiring leads originally run to
(T1-T2) on the solid state module from the line
or transformer.
2. Either tie together the leads originally attached to
the control terminals (M1-M2) on the solid state
module, or remove the leads to M1-M2 and rerun
the control wiring directly from the control to the
contactor coil.
3. The only wiring connections to the new
compressor will be the three high-power leads.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson Copeland Scroll ZP KC Series and is the answer not in the manual?

Emerson Copeland Scroll ZP KC Series Specifications

General IconGeneral
BrandEmerson
ModelCopeland Scroll ZP KC Series
CategoryAir Compressor
LanguageEnglish

Related product manuals