– 6 –
Prior to disassembly of the Zoneline to access components, GE
Factory Service technicians are REQUIRED to follow the Lockout /
Tagout (LOTO) 6 Step Process:
Safety Requirements
GE Factory Service Employees are required to use safety glasses with side shields, safety gloves and
steel toe shoes for all repairs.
Steel Toed Work Boot
Electrically Rated Glove and
Dyneema® Cut Resistant
Glove Keeper
Dyneema®Cut Resistant
Glove
Plano Type Safety Glasses
Prescription Safety Glasses
Safety Glasses must be ANSI
Z87.1-2003 compliant
Brazing Glasses
Cut Resistant Sleeve(s)
Step 1
Plan and Prepare
Step 4
Apply LOTO device and lock
Step 2
Shut down the appliance
Step 5
Control (discharge) stored energy
Step 3
Isolate the appliance
Step 6
Try It” verify that the appliance is
locked out

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AZ45E07DA Series and is the answer not in the manual?

GE AZ45E07DA Series Specifications

General IconGeneral
BrandGE
ModelAZ45E07DA Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals