EasyManuals Logo
Home>GE>Dryer>DCVH515

GE DCVH515 Service Manual

GE DCVH515
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
– 31 –
Idler Assembly
The idler assembly maintains proper tension on the
belt to minimize belt slippage. The idler assembly
consists of an idler pulley that rotates on an idler
arm. The pulley is retained on the arm using a
cap nut. The idler arm is positioned on the chassis
and inserted in a slot in the motor base plate. The
assembly is located to the left of the motor.
WARNING: Sharp edges may be exposed when
servicing the dryer. Use caution to avoid injury.
Wear Kevlar gloves or equivalent protection.
To remove the idler assembly:
Remove the drive belt. (See
Drive Belt.)
WARNING: The idler arm is under high tension. To
prevent injury, do not let the idler arm snap back.
Release tension on the idler assembly by
unlocking the idler arm from the top right
corner of the motor support.
Remove the idler arm from the slot in the motor
base plate.
1.
2.
3.
Remove the idler assembly from the dryer.4.
Drum Shaft Bearing
The drum shaft bearing is mounted on the drum
shaft at the rear of the drum. The bearing fi ts into
the bearing retainer in the center of the heater
assembly.
To remove the drum shaft, remove the drum (See
Drum.) then remove the 3 Torx screws (T-20) that
attach the drum shaft to the rear of the drum.
Idler Arm
Slot

Other manuals for GE DCVH515

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE DCVH515 and is the answer not in the manual?

GE DCVH515 Specifications

General IconGeneral
BrandGE
ModelDCVH515
CategoryDryer
LanguageEnglish

Related product manuals