GE LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3 BASIC SERVICE MANUAL
Chapter 3 - System Setup 3 - 5
Section 3-3
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
The crate with the LOGIQ V5/LOGIQ V3 weighs approximately 50kg. Be prepared for a sudden
shift of weight as the unit is removed from its base (pallet)
Table 3-4: Unpacking the equipment
Step Description Corresponding Graphic
1 Tear the stop open mark.
2 Cut the two packing straps around the crate.
Note: To avoid injury, with one hand holding the
strap clasp when cutting the strap.
3 Remove the top cover of the shipping box.