EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ V5

GE LOGIQ V5 Service Manual

GE LOGIQ V5
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #85 background imageLoading...
Page #85 background image
GE LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3 BASIC SERVICE MANUAL
Chapter 4 - Functional Checks 4 - 3
4-3-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
4-3-2-1 Back-end Processor Power Down
To power down the system:
1.) Press the Power On/Off switch at the front of the system once.
2.) The System-Exit window is displayed.
3.) Using the Set key, select Shutdown.
4.) The shutdown process takes a few seconds and the power off sequence is complete when the
power status LED is turned blue.
5.) Disconnect the probes. Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
4-3-2-2 Scanner Shutdown
Disconnect the Mains Power Cable is necessary. For example: Relocating the scanner.
Figure 4-2 System-Exit Window
CAUTION
DO NOT unplug and/or transport the unit until after the power off sequence has been completed.
Failure to do so may result in corrupted patient files.

Table of Contents

Other manuals for GE LOGIQ V5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ V5 and is the answer not in the manual?

GE LOGIQ V5 Specifications

General IconGeneral
BrandGE
ModelLOGIQ V5
CategoryMedical Equipment
LanguageEnglish

Related product manuals