EasyManuals Logo
Home>GE>UPS>SG 225

GE SG 225 User Manual

GE SG 225
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
Modifications reserved Page 44/79
OPM_SGS_USM_M22_M30_2US_V010.doc User Manual SG Series 225 & 300 UL S2
7 OPERATION
START UP AND COMMISSIONING
A GE GLOBAL SERVICES FIELD ENGINEER must perform start-up and
commissioning of the UPS. Please Contact GE. Global Services at least
two weeks prior to schedule start-up and commissioning at 1-800-637-
1738, or by E-mail at pqservice@ge.com .
This symbol refers to the operations of a parallel system.
NOTE !
Verify for correct input/output cabling before connecting Utility to the
UPS.
Open only the front door, do not remove any panels.
Check after every step for correct reaction of the UPS (LED’s on the
panel), and correct voltage and current measurements, before you
proceed to the next step.
NOTE !
All operations (including start-up, shutdown, removing/adding a unit
from/to a Parallel System) MUST BE PERFORMED with eBoost™ Operation
Mode DISABLED.
Find on the following pages the descriptions of the various procedures of start-up and
shutdown for UPS single and UPS Parallel System, divided into the following principal
chapters:
7.1 PROCEDURES FOR SINGLE SG Series 225 & 300
7.2 PROCEDURES FOR SG Series 225 & 300 PARALLEL SYSTEM STANDARD AND PARALLEL
SYSTEM WITH COMMON BATTERY

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SG 225 and is the answer not in the manual?

GE SG 225 Specifications

General IconGeneral
BrandGE
ModelSG 225
CategoryUPS
LanguageEnglish

Related product manuals