EasyManuals Logo
Home>GE>UPS>SG SERIES 10

GE SG SERIES 10 User Manual

GE SG SERIES 10
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc 42/88 Operating Manual
SG Series
10, 20, 30 & 40 kVA
7 OPERATION
This symbol refers to the operations of a parallel system.
Verify for correct input/output cabling before connecting Utility
to the UPS.
Open only the front door, do not remove any panels.
Now you can initiate the start-up procedure of the UPS system.
There is no need for specific knowledge if you follow carefully
the step-by-step instructions given below.
But we recommend, that at least the initial procedure, should be
performed by an instructed person.
Check after every step for correct reaction of the UPS (LED’s on
the panel), and correct voltage and current measurements,
before you proceed to the next step.
If you encounter any problems during the following procedures,
you should not continue, but contact GE Global Services.
Find on the following pages the descriptions of the various procedures of
startup and shutdown for single and parallel UPS’s, divided into the following
principal chapters:
7.1 PROCEDURES FOR SINGLE UPS
7.2 PROCEDURES FOR UPS FUNCTIONING AS FREQUENCY CONVERTER
7.3 PROCEDURES FOR PARALLEL SYSTEM
7.4 PROCEDURES FOR PARALLEL SYSTEM WITH COMMON BATTERY

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SG SERIES 10 and is the answer not in the manual?

GE SG SERIES 10 Specifications

General IconGeneral
BrandGE
ModelSG SERIES 10
CategoryUPS
LanguageEnglish

Related product manuals