Replacing covers and bumpers
Vivid E80/E90/E95 – Service Manual 8-11
GC091052 Rev. 3
Verification
Perform the following steps to verify that the product is
functioning as intended after this replacement:
1. Connect cables and probes you removed earlier.
2. Power up the Vivid E80/E90/E95 to verify that it operates as
intended.
Top Cover replacement
Read and follow
Preparations
When preparing for the replacement, you must perform the
following steps:
1. Power down the Ultrasound system.
2. Disconnect the Mains Power Cable from the wall outlet.
3. Disconnect all probes and external I/O cabling.
4. Remove the Side Covers.
Remove the Top Cover
Follow these steps to remove the Top Cover:
1. Remove two screws.
WARNING
Energy Control and Power Lockout for Vivid E80/E90/E95.
When servicing parts of the Ultrasound system where there is
exposure to voltage greater than 30 volts:
1. Follow LOCK OUT/TAG OUT procedures.
2. Turn off the breaker.
3. Unplug the Ultrasound system.
4. Maintain control of the Ultrasound system power plug.
5. Wait for at least 30 seconds for capacitors to discharge as
there are no test points to verify isolation.
Ultrasound System components may be energized.

Table of Contents

Other manuals for GE Vivid E80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Vivid E80 and is the answer not in the manual?

GE Vivid E80 Specifications

General IconGeneral
BrandGE
ModelVivid E80
CategoryMedical Equipment
LanguageEnglish

Related product manuals