4. OPERATION
4.1 FINAL INSPECTION
1.
Verify all cables / conduit runs are secured with zip ties or other non-conductive cable
clamps to prevent damage from vibration.
2. Ensure all cables that pass through walls, bulkheads or any other openings are protected
against abrasion by using strain reliefs and/or grommets.
3. Check all AC, DC and ground connections are securely tightened, and if required covered
with suitable anti-seizing grease.
4. Check all connections are secure in the main and sub panels - replace all covers.
5. If required by code, have the installation inspected by an electrical inspector.
4.2 TESTING THE INSTALLATION
1. Apply battery power to the inverter by engaging the fuse or switching the breaker to the
ON position.
2. Disconnect all AC loads from the inverter.
3.
Press the ON/OFF button. The inverter will carry out self-diagnosis and the LED’s will
also appear (various colors).
4.
Connect a 25W light bulb to the inverter output and verify it comes on and shines normally.
5. Press the ON/OFF button. The inverter and LED lights will turn o󰀨.
4.3 CONNECTING THE AC LOADS
Calculate the total power consumption of the output load. Make sure that the total power con-
sumption does not exceed the rated power. If the total power consumption is higher than the
rated power of the inverter, remove the non-critical loads until the total power consumption is
below the rated power.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Go Power GP-ISW-700 and is the answer not in the manual?

Go Power GP-ISW-700 Specifications

General IconGeneral
BrandGo Power
ModelGP-ISW-700
CategoryInverter
LanguageEnglish

Related product manuals