17
User Manual V1.4-2022-08-30 04 Check and Storage
4 Check and Storage
4.1 Check Before Receiving
4.2 Deliverables
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other signs
of equipment damage. Do not unpack the contents from the box and contact the supplier as
soon as possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.
NOTICE
• The number of expansion bolts, PV connectors, and battery connectors are various
depending on dierent inverters. The actual accessories may dier.
• The smart meter will not be included for Battery-Ready models. Contact the manufacturer
or dealer to purchase the smart meter if you need.
WARNING
Connect the DC cables with the included terminals. The manufacturer shall not be liable for
the damage if other terminals are used.
Inverter x 1
Mounting
plate x 1
Expansion bolts x N
PV connectors x N
Battery connectors x N
Documents x 1
PE terminal x 1
ON-GRID AC
connector x 1
BACK-UP AC
connector x 1
Smart meter x 1*
Communication
module x 1
or
or