EasyManuals Logo

Gree SXVD300LCJ2/A-K User Manual

Gree SXVD300LCJ2/A-K
391 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #330 background imageLoading...
Page #330 background image
GMV5 Home DC Inverter Multi VRF Units
324
5. Install a new plate
type heat exchanger
Screw the support of the plate
type heat exchanger and fix the
heat exchanger onto the chassis.
Put the plate type heat
exchanger according to the
position of the suction and
discharge pipes and weld the
pipes with the heat exchanger.
During welding, charge nitrogen
into the pipes. The pressure
should be controlled within 0.5±0.1
kgf/cm2 (relative pressure).
Note: Prevent nearby parts from
being burnt during welding.
6. Fix and wire the
electric box.
●Put the electric box back to
original position and screw it up.
●Connect all the wires.
7. Check and install
the front panels.
●Check the parts and connecting
wires.
●If no problem is found, hook the
front panels and tighten the
screws.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree SXVD300LCJ2/A-K and is the answer not in the manual?

Gree SXVD300LCJ2/A-K Specifications

General IconGeneral
BrandGree
ModelSXVD300LCJ2/A-K
CategoryInverter
LanguageEnglish

Related product manuals