Installation RS20/22/30/32/40
Release
05
12/2015
45
2Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Checking the package contents
Installing and grounding the device
Installing an SFP transceiver (optional)
Adjust DIP switch settings
Connecting the terminal block
Connecting the ferrite
Mounting the terminal block
Operating the device
Connecting data cables
Filling out the inscription label