EasyManuals Logo
Home>Honeywell>Control Unit>5496

Honeywell 5496 User Manual

Honeywell 5496
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
151276-L8
3-1
Section 3
Hardware Installation
5496 installation involves the following steps:
Connect AC power (Section 3.1) and backup battery (Section 3.2).
Make physical connection to a Silent Knight addressable FACP (see Section 3.3).
Set an ID for the 5496 (Section 3.3.1).
Make physical connection to any outputs that will be powered by this 5496. See
Section 3.4 for notification appliance wiring information. Refer to Silent Knight
addressable FACP Installation Manuals for software configuration information and
other information about installing outputs. Silent Knight Addressable FACP
Installation Manuals can be found on Silent Knight’s web site at
www.silentknight.com.
3.1 AC Power
At installation, connect the AC terminals to 120 VAC source as shown in Figure 3-1. It
may be necessary for a professional electrician to make this connection.
The AC terminals are rated as 120 VAC, 50 or 60 Hz, 2.5 A.
Figure 3-1 AC Power Connection
To AC
To 120 VAC
Power Source
Supervised
Non-power limited

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell 5496 and is the answer not in the manual?

Honeywell 5496 Specifications

General IconGeneral
BrandHoneywell
Model5496
CategoryControl Unit
LanguageEnglish

Related product manuals